topnew

 


 

 

 

 

 

 


sidemenu

  Head Office

P.O.Box 5330

Jeddah 21422

Saudi Arabia

email:

IS@yanbucement.com

Tel:                          (966 2)6531555    

Fax:                        (966 2) 6531420


  Yanbu Office

P.O.Box 467

Yanbu

Saudi Arabia

Tel:                          (966 4)3225222    

Fax:                        (966 4) 3223612

email:

info@yanbucement.com


YCC Web Poll
What do you think of the new site design?

Good
Average
Poor
Im not sure


Current Results


 


 


 


 

wel

Projects & Planning:

A Separate Project and Planning Department is functioning under the direct control of Board Member and Director General.

This Department was fully instrumental in the construction of an additional Production line of 7000 tons clinker per day from the project concept to commissioning stage. This major project constituted all production sections of a seperate cement plant,in addition to a latest technology 90MW Diesel power plant and a 5000 tons per day desalination plant.

This department has started the implementation of an additional project for the reduction of production cost in the existing 20 year old production line. This project constitutes installation of a fuel firing system which replaces the existing crude oil firing circuit by a cheaper fuel -Heavey fuel oil. Right from design stage this project is handled by in-house expertise,but with latest technology available in this field. Care jas also been taken that the project technology matches with the present operating philosophy such that implementation of the project yields results as soon as the project is commissioned.

Additional project under implementation is the augmentation of power production by the  installation of one more generator in the existing power plant. The completion of this project will help in producing the required power for the cement plant entirely with the available cheaper fuel in this part of the country.

Keeping with the Company's policy of maintaining highest environmental standards, presently this department is under active consideration of installation of latest state of art technology based Electrostatic Precipitators in the existing 20 year old lines.  

 

 


Webmaster Huneyd Yahyabhoy, Web Design Rashed Islam

All Email Enquiries to ISD Manager reda@yanbucement.com

                           

Site Best viewed in the 800x600 mode